For longer slopes and lower roof pitches contact fabral for other suitable profiles.
Metal roof transition flashing detail.
10 long length 26 gauge metal matches the color of the panels use with inside closures and outside closures how many do i need.
Masterrib is a 36 w.
Transition flashing installation guide 1.
It s the same piece and i m going to show you how to install that now.
Refer to the rain carrying table in this booklet for the maximum allowable panel length per slope that will provide adequate drainage.
The roof plane goes from one pitch to a lower pitch.
The piece that allows us to join the two different slopes is the pitch transition trim.
Roof pitch the metal roofing panels shown in this manual require a min imum slope of 2 สบ per foot to ensure proper drainage.
This is a fairly common roof detail.
Measure 1 1 2 from bottom edge of transition flashing.
Pitch transitions are a common roof detail.
After bottom roofing panels have been installed set one piece of transition flashing down where the top portion non hemmed of the transition flashing lies flat on the upper roof 3.
We see this quite frequently in log home roofs with porches for example.
Just simple 3d animated digital instructions on how to install transition trim on a masterrib metal roof.
See the illustration below.
Install bottom roofing panels first 2.
A roof pitch transition is a line in the roof plane that changes pitch.